Gas Explosion at Porsche Factory Expected to Postpone 911 Production

porschefactoryhl.jpg

Porsche reported today that its production of the 911 model will be on hold for between two and three days, due to a gas explosion in the spray-painting area of its main production facility in Zuffenhausen, Germany.

Reports indicate that the explosion caused two employees to suffer minor injuries, but no fatalities were incurred. The spray-painting unit and some other areas of the production system have been partially flooded, after water from the fire-extinguishing system covered the area.

At 160 911’s per day, Porsche stands to hold up a significant portion of the sports car supply. However the Cayenne and Boxster, both produced at facilities elsewhere in Europe, shouldn’t be affected by the accident.

+ Automotive News Europe: Porsche to postpone making 911 cars after gas explosion (subscription may be required)

If you’ve got an idea for Question of the Day, a funny photo for Caption It, or just want to share a news tip, let us know at windingroadtips@gmail.com

Related:

Comments

Auto News » Gas Explosion at Porsche Factory Expected to Pos

[...] Mike Hanley wrote an interesting post today onHere’s a quick excerpt Porsche reported today that its production of the 911 model will be on hold for between two and three days, due to a gas explosion in the spray-painting area of its main production facility in Zuffenhausen, Germany. Reports indicate that the explosion caused two employees to suffer minor injuries, but no fatalities were incurred. The spray-painting unit and some other areas of the production system have been partially flooded, after water from the fire-extinguishing system covered the area. At 160 911’s per day, Porsche stands to hold up a significant portion of the sports car supply. However the Cayenne and Boxster, both produced at facilities elsewhere in Europe, shouldn’t be affected by the accident. [...]

mbslrm

We need a moment of silence for the 911s.

Winding Road » Archive » Porsche to Reopen 911 Plant Tomorro

[...] production at its 911 model plants in Zuffenhausen, Germany on Monday. The reopening comes after a gas explosion in the paint-spraying unit at the plant closed it [...]

Post new comment

The content of this field is kept private and will not be shown publicly.
  • Web page addresses and e-mail addresses turn into links automatically.
  • Allowed HTML tags: <a> <em> <strong> <cite> <code> <ul> <ol> <li> <dl> <dt> <dd> <img> <table> <tbody> <tr> <td> <th> <div> <span> <p> <br> <blockquote> <hr> <b> <i> <u> <strike> <sup> <sub> <object> <embed> <param>
  • Lines and paragraphs break automatically.

More information about formatting options

Question of the Day

As our lovely Michigan summer continues to fly, ...

Jul 24, 2008 by Seyth Miersma

Alfa Spider Seeks 230 MPH

Bonnie2_155.jpg

Though it may look considerably sleeker and more p...

Jul 24, 2008 by Seyth Miersma